ONGOING PROJECTS

1) SEB PROJECT – SUPPLY, DELIVERY, INSTALLATION, TESTING AND COMMISSIONING OF 2 UNITS OF 33KV REACTORS AT TUDAN 275KV SUBSTATION

2) SEB PROJECT – REPLACEMENT OF 275kV CIRCUIT BREAKER AND 275kV LINE DISCONNECTOR EQUIPPED WITH EARTH SWITCH AT ENGKILILI 275kV SUBSTATION

3) SEB PROJECT – REPLACEMENT OF 132kV & 275kV CIRCUIT BREAKER AND LINE DISCONNECTOR EQUIPPED WITH EARTH SWITCH AT KEMANTAN 275kV SUBSTATION

4) SEB PROJECT – REPLACEMENT OF 275KV CURRENT TRANSFORMER FOR MAMBONG 275KV S/S

5) SEB PROJECT – DESIGN, SUPPLY, ASSEMBLY, DELIVERY, TESTING AND COMMISSIONING OF 33kV AND 11kV MOBILE SWITHGEAR

6) SEB PROJECT – BAK1/2019/MHM SUPPLY, DELIVERY, INSTALLATION, TESTING AND COMMISSIONING OF CURRENT DIFFERENTIAL PROTECTION FOR BAKUN HYDRO ELECTRIC POWER PLANT (DIAMETER 8 – DIAMETER 1 FROM BAKUN HYDRO ELECTRIC POWER PLANT TO 275KV BAKUN SWITCHYARD)

7) SEB PROJECT – BAK10/2021/AGA Replacement of Distance Protection Relay to Current Differential Relay for Bakun Hydro Power Generation (BHPG)

8) SPS/WAMS/TLMS/TWS PROJECT:-

    i) Niah 275kV S/S (SPS/WAMS/TLMS/TWS)
    ii) MJC 132kV S/S (TLMS/TWS)

    iii) Samalaju CCPP 275kV S/S (WAMS/TLMS/TWS)

    iv) Tudan – Miri CCPP 275kV S/S (WAMS/TWS)
    v) Tg Bako 275kV S/S (SPS/WAMS/TLMS/TWS)
    vi) Entinggan B 275kV S/S (SPS/WAMS/TLMS/TWS)
    vii) Serian 275kV S/S (SPS/WAMS/TLMS/TWS)
    viii) Bakun – Murum Junction 275kV S/S Extension (SPS/WAMS/TLMS/TWS)
    ix) Mapai 500kV S/S (SPS/WAMS/TLMS/TWS)